CONVENTIONAL GENERATION
“Almaty Power Plants” JSC
(“Samruk-Energy” JSC – 100 %)
“Almaty Power Plants” JSC (“APP” JSC) is an energy-producing organization engaged in heat and electricity production in Almaty city and Almaty region. “APP” JSC provides electricity and heat to the population, industrial and agricultural enterprises, and is a natural monopoly entity in heat production.
To date, the generated heat and electricity covers about 70 % of demand of Almaty city and Almaty region.
The structure of the company includes thermal plants – CHP-1, CHP-2, CHP-3; Western Thermal Complex; hydropower plants – Kapshagai and Cascade of Hydro power plants; Industrial repair enterprise “Energoremont”, Center for receiving and discharge of fuel.
Financial performance
Indicator |
Measurement unit |
2016 |
2017 |
2018 |
Net income/loss |
mln. tenge |
5,927 |
1,522 |
(1,620) |
EBITDA |
mln. tenge |
14,354 |
12,290 |
11,147 |
EBITDA Margin |
% |
24 |
20 |
17 |
Results of operating activities
Indicator |
Measurement unit |
2016 |
2017 |
2018 |
Installed electric capacity |
MW |
1,239 |
1,239 |
1,235.7 |
Electricity production volume |
mln. kWh |
5,911 |
5,712 |
5,599 |
Electricity sales volume |
mln. kWh |
5,214 |
5,072 |
4,893 |
Heat production volume |
thous. Gcal |
4,971 |
5,507 |
5,916 |
Heat sales volume |
thous. Gcal |
4,970.5 |
5,223 |
5,617 |
ENVIRONMENTAL INDICATORS

SOCIAL INDICATORS

More information available on the website: www.ales.kz
“Ekibastuz SDPP-1 named after Bulat Nurzhanov”
(“Samruk-Energy” JSC – 100 %)
“Ekibastuz SDPP-1” LLP is the largest thermal power plant in Kazakhstan, which operates on coal-fired, located in Ekibastuz city, Pavlodar region of Kazakhstan. Operating capacity of SDPP-1 is 3500 MW. The main fuel of power plant is Ekibastuz deposits’ coal. The complex consists of 8 power units with a capacity of 500 MW each and the building itself has very impressive dimensions: the length of the main building is 500 meters, the width is 132 meters, and the height is 64 meters. Two chimneys of 310 and 330 meters each.
The company provides electricity to the northern, eastern and southern regions of Kazakhstan, part of the electricity (20 %) is exported to Russia.
Financial performance
Indicator |
Measurement unit |
2016 |
2017 |
2018 |
Net income/loss |
mln. tenge |
5,217 |
3,859 |
18,072 |
EBITDA |
mln. tenge |
33,978 |
36,826 |
58,979 |
EBITDA Margin |
% |
54 |
41 |
47 |
Results of operating activities
Indicator |
Measurement unit |
2016 |
2017 |
2018 |
Installed electric capacity. |
MW |
4,000 |
4,000 |
3,500 |
Electricity production volume |
mln.,kWh |
9,037 |
14,797 |
19,121 |
Electricity sales volume |
mln. kWh |
8,523 |
14,022 |
18,180 |
Electricity transmission volume |
Gcal |
– |
27,275 |
175,072 |
Heat production volume |
|
– |
4,153 |
37,562 |
Heat sales volume |
|
64 |
72 |
72 |
ENVIRONMENTAL INDICATORS

SOCIAL INDICATORS

More information available on the website: www.gres1.kz
“Ekibastuz SDPP-2 Plant” JSC
(“Samruk-Energy” JSC – 50 %. “Inter RAO” PJSC – 50 %)
“Ekibastuz SDPP-2 Plant” JSC is the second, after the Ekibastuz SDPP-1, thermal power plant in Ekibastuz city of Pavlodar region of Kazakhstan with a capacity of 1000 MW. The joint-stock company represents the interests of the two largest participants of the Russian and Kazakhstan power markets: “INTER RAO UES” JSC (Russia) and “Samruk-Energy” JSC (Kazakhstan), which owns 50 % of shares.
Ekibastuz SDPP-2 was designed with an installed capacity of 4,000 MW (eight power units of 500 MW each). At this time, the installed capacity of the existing SDPP is 1,000 MW, and the available – 940 MW. Reinforced concrete chimney, built in 1987, having a height of 420 m, is the highest in the world and it is listed in the Guinness Book of Records, SDPP-2 operates on high-ash coals of Ekibastuz coal basin.
Ekibastuz SDPP-2 plant was one of the first to install the highly efficient Alstom electrostatic precipitators, which allowed the plant to reduce its emissions to the atmosphere and thereby significantly improve the environmental situation in Pavlodar region.
Financial performance
Indicator |
Measurement unit |
2016 |
2017 |
2018 |
Net income /loss |
mln. tenge |
1,575 |
(19,092) |
(6,823) |
EBITDA |
mln. tenge |
13,138 |
12,594 |
16,250 |
EBITDA margin |
% |
42 |
37 |
42 |
Results of operating activities
Indicator |
Measurement unit |
2016 |
2017 |
2018 |
Installed electric capacity |
MW |
1,000 |
1,000 |
1,000 |
electricity production volume |
mln. kWh |
4,976 |
5,495 |
5,436.5 |
electricity sales volume |
mln. kWh |
4,707 |
5,208 |
5,161 |
volume of heat sales |
thous. Gcal |
70.837 |
66.515 |
78.622 |
ENVIRONMENTAL INDICATORS/h4>
SOCIAL INDICATORS

More information available on the website: www.gres2.kz